jbs chiller foundation concrete placement JBS Australia
Chiller Extensions
Specialist Concrete Construction Services Contact us today

JBS Australia

Project Description:

Chiller foundations and slabs to enable operation expansion at the Dinmore facility.

 

Project details

Completion of Stage 1 of a 3-stage concrete construction of chiller foundations and slabs.

 

What were the challenges?

Geo testing indicated poor soil conditions at the site with limited bearing capacity.

 

How did Terazzo solve these challenges?

Constant geo-testing was conducted, the results of which indicated the need for additional bored piers that we installed.

Heavy duty, early-strength concrete with two layers of mesh was used which enabled us to fast-track the access time for the other trades to build the chillers.

 

Project result

We overcame poor site soil conditions through additional foundations to create a solid base for chiller construction, and operational expansion of the company.

chiller foundation completed

See more information about our work for
Abattoirs and Food Processing Facilities

Contact Us